This process usually takes a few weeks to complete the 1100 homes within the community.
Only the exterior is inspected, so homeowners do not need to be present. If an issue is noted, the Emerson Community Manager will send a notification with a timeframe for addressing the issue.
The checklist provided to the teams is as follows:
ANNUAL INSPECTION CHECKLIST
OVERALL HOUSE MAINTENANCE
| ||
Roof Elements
|
Roof Shingles: (cleaning or repair)
| |
Gutters & Downspouts
|
Reattach to house clean
| |
Siding
|
Clean, paint or repair
| |
Trim Elements
|
Window, Door, and Columns – clean or paint
| |
Doors
|
Front Door needs painting
| |
Shutters
|
Missing or Faded
| |
Foundation (Walls / Areaway)
|
• Brick foundation cleaned or painted
• Outside stairway to basement clean or paint | |
Front Entry
(Walks / Stoop / Steps) |
• Damaged Concrete
• Dirty Concrete or rust stains | |
House Address Pad
|
Must be visible from street
| |
Deck maintenance
|
Railings, fascia needs cleaning or painting
| |
Patio maintenance
|
Weeds in pavers
| |
YARD ELEMENTS & LANDSCAPE ISSUES
| ||
Grass / Lawn Maintenance:
|
Lawn in need of Mowing Bare Spots
| |
Tree Circle Edging
|
“Visible Masonry Tree Circle Edging” in front yards is not permitted:
| |
Landscape Edging & Walls)
|
Must be approved and in keeping with house colors
| |
Pruning (Trees)
|
Branches hanging over sidewalks need to be trimmed
| |
Pruning (Shrubs)
|
• Trim shrubs under windows
• Remove and replace dead shrubs • Trim shrubs hiding house number | |
MISCELLANEOUS ISSUES
| ||
Trash Cans / Screens
|
Trash and recycle cans not visible
| |
Basketball Backstops
|
• No record of ARB Approval
• Not Permitted in Townhomes • Not Permitted in Street or Street right-of-way |
No comments:
Post a Comment