Tuesday, November 16, 2021

2021 Autumn Walk HOA Annual Meeting

The 2021 Autumn Walk HOA Annual Meeting was held on Tuesday, November 2, 2021 as a virtual (videoconferencing) meeting.

Attendance:

  • Board of Directors: Dharmesh Patel (9811), Allie Stegner (9832), Fred Leong (9854)
  • AJ (9838), Mike (9853)
  • Proxies (11): 9808, 9810, 8914, 9815, 9823, 9825, 9838, 9840, 9843, 9852, 9860 [Dharmesh will send to CAS]
  • Management: April Day, Community Association Services (CAS)
Agenda:
  • Approval of 2020 Minutes
  • Report on past year
  • Landscaping
  • FY22 Budget
  • Elections
Meeting Notes:

  1. Meeting was called to order by Dharmesh at 6:05 PM
    1. Quorum was achieved (12 houses needed, Dharmesh will send proxies to CAS)
  2. 2021 Annual Meeting minutes (written by Allie)
    1. Approved 2020 Minutes 3-0 [Dharmesh motion, Allie second]
  3. Report on past year
    1. No events in 2020 due to pandemic
    2. Ice Cream Social in August 2021
    3. Halloween Parade on Oct. 31 (Allie reported most residents and children in attendance of any previous event)
  4. Landscaping
    1. Discussion of what has been done, what the contract calls for, and what needs to be corrected
    2. Fall mulching and aerating with overseeding completed
    3. However, Fred asked:

Wednesday, November 3, 2021

Winterizing Your Home Reminder

With Western Howard County experiencing freeze warnings this week, it's a good reminder to start winterizing your home.

In particular you may want to turn off your outside faucets this month to avoid frozen pipes later this winter, and consider changing the airflow in your ducts if your basements get cold in the winter.

Related Posts:

Tuesday, November 2, 2021

Stephens Road Bridge Construction

The construction of the new Stephens Road Bridge, which raises it 8-10 feet out of the floodplain, is nearing completion.

Stephens Road will be closed during working hours 7 AM - 5 PM the next two days (Wednesday and Thursday, 11/3/21 - 11/4/21) for construction of the new traffic medians. Information is available on a voice recording by calling Howard County at 410-313-3638.

Photos of the construction are also available on Howard County's Web Site:



Content

Update (Aug. 2021)

Phase 2 of the capital project (construction of western half of the bridge) is currently underway. The bridge deck concrete pour is complete; remaining work includes: superstructure, roadway fill, paving and sidewalk along the southbound portion which is to be completed by the end of August. 

Vehicular traffic is scheduled to be shifted to the newly built portion of roadway in early September to allow the contractor to build the sidewalk along the northbound portion and finish grading of the shoulder areas.  In early October, the contractor will complete the concrete median areas. This project also includes rehabilitation and grading of the existing storm water management facility behind the Hammonds Promise Overlook community. The entire project is scheduled to be completed by the end of 2021.

Recent construction photos can be found here:

Replacement of the existing bridge over the Hammond Branch of the Little Patuxent River.  Included in the project is continuous sidewalk construction along both sides of Stephens between Whiskey Bottom Road and Gorman Road.  Bicycle accommodation along roadway is also included.

  • Estimated cost of project: $5-10M
  • Actual construction start: Summer 2020
  • Estimated construction completion: Fall/Winter 2021

Displays presented at 3/7/2018 public meeting can be found here: 

Monday, November 1, 2021

Autumn Walk HOA Annual Meeting (11/2/21 @ 6 PM)

For clarification, the time listed on the Annual Meeting Proxy for the Autumn Walk Annual Meeting and Elections is correct, the meeting will start at 6 PM via Zoom. Please see your mailed letters or emails for the link.

Autumn Walk HOA 2021 Annual Meeting
Tuesday, November 2, 2021
6 PM EST

Agenda:

  • FY22 Budget
  • Discussion of homeowner fees
  • Elections (one position)